BioLegend Campus
The 8-acre campus design included a complete overhaul of three out of four older buildings. One demolished building was replaced by the main campus building with an iconic 70-foot-tall atrium as its focal point. From the atrium, BioLegend employees access the upper floor labs, offices, break rooms and conference rooms.
Forward thinking sustainable strategies were introduced, including copious amounts of natural lighting through large windows and the atrium structure. As part of the larger project, the team replaced the existing glazing with new high-performance glazing.
Architect: Delawie Architecture
General Contractor: DPR Construction
Construction Manager: Hughes Marino
Window Fabricator: WHTB Glass
Glazing Contractor: Novum Structures
Year completed: 2019
Technoform product used: Technoform plastic hybrid stainless steel warm edge spacer (SP13)
Photo Credits: Whalen Architectural Photography