Efficient, low-emission and reliable – Retrofit at the waste-to-energy plant Burgkirchen

Retrofit Wärmetauscher
Temperature (°C) 220
Design pressure (bar g) 0,1
Heat duty (MW) 2,0
Sulfuric acid (mg/Nm³) > 300
Acid dew point (°C) 160
Hydrochloric acid (mg/Nm³) > 2000
Hydrofluoric acid (mg/Nm³) > 40

Outcome:

emission reduction

daily average HCl value < 1,0 mg/Nm³

Plant safety

No tube breakages since commissioning

Effiency:

Heat output and pressure drop within the planned target range

Cost-effectiveness:

Reduced operating and maintenance costs due to the elimination of unplanned shutdowns

Next steps:

Thanks to the close cooperation and coordination between the plant experts and the Technoform team, the replacement was successfully completed within the scheduled revision period. Following these positive results, the conversion of a second incineration line to PPS-GR is already being planned.

Do you have a challenge for us?

Constant innovation is what makes us tick. If you have a conundrum, let us work together to find the perfect solution.